Salient features of the Project
- Strategic Location – Located on the International Trade Route, with existing transhipment terminals like Singapore, Klang and Colombo in proximity.
- Draft – Natural depth of 20m
- Catchment – Potential to capture transhipment cargo from the similar international facilities in the sub-continent and Ports in the proximity including Indian Ports.
- Project features for Phase 1 – Two breakwaters, 400m wide navigational channel, 800m dia turning circle, total berth length of about 2.3km translating to 7 berths, 125 Ha for container yard, container handling equipment including RMQCs and RTGs, provision to develop 2 liquid cargo berths